Multi-Campus Master Plan

The Lycée Français de San Francisco (LFSF) was founded in 1967 upon principles of internationalism and inclusion. The accredited program (French Ministry of Education) helps 900 students, PreK-12, build confidence and adaptability in their ever-changing environment through a multilingual and multicultural education.

As a critical first step in the design process, the Master Plan creates a framework that outlines a collection of projects of various types and sizes across all three campuses: Sausalito, Ashbury, and Ortega.

A comprehensive campus master plan established a shared vision for enhancing learning environments, expanding capacity, and strengthening the identity of all three campuses.

Client
Lycée Français de San Francisco

Location
San Francisco, California

Services
Stakeholder Engagement and Master Planning

Size
Ortega: 44,752 sq ft
Sausalito: 26,784 sq ft
Ashbury: 43,895 sq ft

Understanding the Community and Establishing Priorities

To better understand the community’s perspective of LFSF and the facilities as a whole, we collected valuable feedback through a range of data collection strategies, including an online survey, focus groups, site visits, and in-person interviews with staff, while research goals aimed to identify and prioritize challenges and opportunities.

Our firm worked with the LFSF Board of Trustees to explore various design options informed by guiding principles to determine efficiency and priorities.

Master plan discovery diagram illustrating how community survey feedback and strategic priorities inform four guiding principles: social development, academic excellence, culture and identity, and green initiatives.
Architectural rendering of a school playground featuring colorful play surfaces, tiered seating, shaded gathering spaces, and basketball hoops surrounded by trees and landscaping.
Architectural rendering of a landscaped school courtyard featuring natural play elements, winding pathways, native plantings, and outdoor gathering areas.
Planning the Growth Across Three Campuses

Through this research, our team discovered that a new building at the Ashbury campus will greatly increase enrollment capacity and introduce additional amenities, including outdoor play spaces and indoor gymnasium space.

Existing building interventions address enhancing student experience through improved and connected spaces that better serve existing program needs. Across all campuses, optimizing space use requires flexible spaces and efficient program adjacencies.

The LFSF project also includes the addition of a new building and renovations to existing buildings, from expanding corridors to optimizing room layouts and relocating programming for best fit.

The holistic approach taken at LFSF’s three campuses is a great example of the care our firm will take with improving student experience through enhanced visual impact, resources, and social-emotional learning. Improving the collective identity will be central to the design process.

Architectural rendering of the proposed Ashbury campus building featuring brick and wood-clad facades, large glass windows, and landscaped surroundings.
Architectural rendering of a student commons featuring flexible seating, a living green wall, wood ceiling elements, and connections to an outdoor courtyard.
Architectural rendering of a school courtyard featuring outdoor seating, colorful geometric murals, shaded gathering areas, and a central tree.
Previous
Previous

Liverpool Central School District: Chestnut Hill Elementary School Modernization

Next
Next

Champs International School: New Campus Conceptual Design