With extensive experience in laboratory planning and design for higher education institutions, Ashley McGraw Architects has programmed and led small laboratory designs ranging from $500,000-$1,500,000 for multi-disciplinary science programs at Cornell University through a term agreement. As campuses welcomes new researchers, it comes with a need for providing an adequate, often new facility for the researcher and their supporting staff in a timely manner. Here are a few lessoned learned:

  • Bring In End-Users Early: Often these small lab projects have short duration. So jump right into the design of space by encouraging the researchers to provide a layout. Often they know best on how the space should run and function. Take advantage of their expertise! Yet, help them to develop a matrix in gathering information of their lab equipment.

  • Look at the Overall Building: Even though the footprint of the project may be small, it’s tied to the rest of the building and cannot be ignored. Both dealing with how chemicals should be distributed or how building systems should be either accommodated or revamped.

  • Time is of the Essence: Consider early packages in reducing time. Develop a separate package for long lead items such as casework, epoxy tops, fumehoods, etc. Or an alternative, involve a lab vendor in developing casework design/shop drawings.

Thoughtfully planned laboratory renovations create adaptable research environments that support innovation and scientific advancement.

Client
Binghamton University Foundation

Location
Ithaca, New York

Services
Architecture, Stakeholder Engagement, and Renovation

Size
951 sq ft (Bard Hall Lab)
900 sq ft (Vet Research Tower)
1,800 sq ft (Comstock Hall Lab)
1,615 sq ft (Phillips Hall Lab)
2,656 sq ft (Hollister Hall Lab)

Researchers working in a Cornell University laboratory with chemical fume hoods and laboratory workstations.

The project renovated lab spaces SB28 and SB47 within the sub-basement of Bard Hall. The enabling part for the consolidation of existing faculty scope of the renovation will include design of the new spaces for the two existing laboratories that currently occupy Duffield labs 207 and 227. Room SB37 currently houses an environmental chamber that extends above the suspended ceiling which will have to be removed as part of the enabling scope.

Bard Hall Lab Renovations
Researchers using advanced scientific equipment in a Cornell University research laboratory.
Researchers conducting microscopy and laboratory analysis in a Cornell University research space.

The scope of this project was to consolidate the lab space on the floor and update the casework and architectural finishes in approximately 900 SF of existing laboratory space in support of faculty retention and recruitment. Coordinated abatement of existing lab tops, VAT flooring, and transite panels in an existing fume hood superstructure, including minor plumbing, electrical, and HVAC work to align services with the new casework and equipment.

Vet Research Tower T8001, T8001A, T8003 Lab Modifications
Researcher conducting materials testing in a Cornell University laboratory.
Researcher using a microscope in a Cornell University laboratory.

Renovated approximately 1,800 square feet of existing wet laboratory space on the sixth floor of Comstock Hall. Comstock Hall was constructed in 1982. The area included in this renovation is currently configured and operating as a wet laboratory space. The scope of work includes construction of an insect rearing room, cell culture room, virus transmission room, equipment room and renewal of two existing controlled environment rooms/chambers. All laboratory space will meet ACL-2 standards and operating requirements.

Comstock Hall Lab Renovations
Researcher working in a controlled environment growth chamber at Cornell University.
Researcher working at a laboratory bench in a Cornell University research lab.

Cornell University sought design services to renovate lab spaces in Phillips Hall. The research labs in Phillips Hall rooms 122, 122A, 122B, 122C and 122D comprised 1,615 sf of space that needed renovation. The primary investigator focuses their lab research on developing concepts and technologies leading to integrated microsystems using micro and nanoscale fabrication techniques.

The project required reconfiguring layouts to utilize both existing equipment and additional relocated equipment. It involved reconfiguring existing power, lab gas, and compressed air services to support equipment in the new layout. The work also included new casework, lab benches, new finishes, a laser room and two new snorkel exhausts for soldering.

While the existing temperature controls had been operating well and were not anticipated to change, the existing occupancy sensors in the lab created noise or interference with some of the measurements taken during experiments and needed replacement.

An exterior air handling unit was needed to improve air quality. The air handling unit was placed exterior to the lab and an enclosure with metal panels was designed to obscure the unit.

Phillips Hall Rooms 122, 122A-D Lab Renovation
Researchers working in a flexible research laboratory at Cornell University.
Researchers working in a laboratory at Cornell University.

The renovation of lab space SB28 was within the sub-basement of Bard Hall, Material Science and Engineering Department for the occupancy of new faculty members with research focusing on Materials Synthesis and Processing. Lab SB28 had four large fume hoods that were removed and replaced with three new 6’ general chemistry fume hoods (one of which was ADA compliant). New architectural finishes, lab casework including a sink (ADA height), chemical storage cabinets for under the non-ADA hoods, a worktable, and gas cylinder storage were part of the scope.

Bard Hall SB28

For Cornell University’s College of Engineering, Ashley McGraw Architects completed a laboratory renovation project in Hollister Hall to accommodate expanded research capabilities within the Civil and Environmental Engineering department. This conversion transformed existing educational spaces into state-of-the-art wet laboratory facilities, specifically designed to support an incoming faculty member's research program. The research focuses on Environmental Processes and Geotechnical Engineering.

The project encompassed the complete transformation of Rooms 166 and 162, previously serving as a meeting room and classroom, into advanced wet laboratory space. A key feature of the design included the development of a shared support area that now serves both the new laboratory and existing research facilities, maximizing operational efficiency and promoting collaborative opportunities.

Technical improvements included the replacement of air handling unit and additional ventilation to accommodate fume hoods and snorkles along with additional capacity for future equipment. The toxic gas monitoring system was also upgraded into one central system throughout the building’s labs.

An exterior chemical storage enclosure was designed at the loading dock to accommodate chemical storage needs of the researchers.

Hollister Hall 162 and 166 Lab Renovation 
Modern teaching laboratory with flexible workstations and natural daylight at Cornell University.
Interior corridor overlooking laboratory space at Cornell University.
Researcher using a laboratory fume hood in a Cornell University science lab.
Previous
Previous

Binghamton University Science IV

Next
Next

Cornell University Beebe Hall Maker Hub Renovations Feasibility Study